November 20, 2024
After a two-month delivery delay, structural steel is now on site! Steel moment frames have been constructed through the main part of the building, which will allow the space to roofed and sealed in. Although the goal was to have this exterior work complete before the rainy season started, the contractors have been flexible and completed much in the past month.
All of parking lot curbing is now in place, safety bollards have been set where sidewalks will be poured, beams have gone up over the meeting room and children’s areas, and all of the building’s cedar siding has been treated in a temporary tent on site.